Delays on First Avenue and Steve Irwin Way as Major Projects Continue
Morning Traffic Overview
Commuters across the Sunshine Coast should prepare for a mix of major infrastructure upgrades and local maintenance projects this Wednesday, 4 March 2026. While the Bruce Highway is currently seeing steady flow through the newly completed sections near the Sunshine Motorway, significant arterial changes in Maroochydore and the southern hinterland are expected to impact travel times throughout the day.
Major Construction in Maroochydore
The First Avenue upgrade in Maroochydore remains the most significant point of disruption for local drivers. As part of a long-term transformation project, the northbound lane of First Avenue is currently closed from Aerodrome Road to The Esplanade. This closure is expected to remain in place for several months, with traffic restricted to southbound travel only. Motorists heading north are advised to utilize detours via Aerodrome Road and Second Avenue. Local businesses remain open, but parking and pedestrian access near the Cornmeal Parade car park may be subject to intermittent traffic control.
Hinterland and Rail Corridor Alerts
Heavy vehicle movements and changed traffic conditions continue on Steve Irwin Way between Beerburrum and Beerwah. These disruptions are tied to the ongoing Beerburrum to Nambour Rail Upgrade Stage 1. Drivers should expect reduced speed limits and potential delays between 6:00 am and 6:00 pm. Traffic controllers are on-site to manage the influx of construction vehicles, so please allow an extra 10 to 15 minutes if traveling through this corridor.
Local Roadworks and Resealing
Sunshine Coast Council has scheduled several maintenance projects to begin or continue today:
- Eumundi: Road resealing works are scheduled to commence on Jocelyn Drive today. Motorists should expect short-term delays and restricted property access during active work hours.
- Sunrise Beach: Stabilization works are underway near Ross Crescent to address previous landslide damage. Expect a road closure near the pathway entrance and active traffic management in the surrounding streets.
- Rosemount and Flaxton: While works on Petrie Creek Road and Ensbey Road are nearing completion, minor lane reductions may still be present. No major delays are currently anticipated for these specific sites.
Public Transport and Bus Detours
The Sunshine Coast rail line is operating on a normal weekday schedule today, with major track works not scheduled until later in the month. However, bus commuters should be aware of several route changes:
- Routes 5601, 5719, and 5728 continue to detour around the First Avenue construction zone in Maroochydore.
- In Dicky Beach, Cooroy Street remains closed between Coochin Street and Beerburrum Street. Routes 5541, 5551, 5702, and 5717 are being diverted via Coonowrin Street, with temporary stops in place on Beerburrum Street.
Commuters are encouraged to check real-time updates via the TransLink app before starting their journey to account for any morning peak congestion or mechanical delays.

St. Paddy’s Day and Surf Culture: What’s On Today in the Sunshine Coast

Green Pints, Smooth Ramps, and Clear Skies: Your Sunshine Coast Tuesday Briefing

Commuter Alert: Major Rail Shutdown and Mooloolaba Traffic Impacts This Tuesday
