Widespread Delays Expected on Steve Irwin Way and Sunshine Coast Rail Line Today

Commuter Alert: Wednesday, March 11, 2026
Commuters across the Sunshine Coast are advised to prepare for a challenging journey this morning, with significant construction activity and public transport disruptions affecting major corridors. As of today, Wednesday, March 11, several key infrastructure projects have reached critical phases, leading to changed traffic conditions and scheduling delays for both motorists and rail passengers.
Major Roadworks and Arterial Delays
The most significant impact on road travel today is along Steve Irwin Way. Construction on the Beerburrum to Nambour Rail Upgrade has intensified between Beerburrum and Beerwah. Motorists should expect reduced speed limits, lane shifts, and a heavy presence of construction vehicles. Specifically, the section between Nursery Road and Moffatt Road has been realigned, and Moffatt Road remains closed to through traffic as part of ongoing drainage and earthworks.
Further north, the Mooloolah River Interchange (MRI) upgrade is in its early stages of major construction. Geotechnical investigations and site clearing are currently concentrated around Mountain Creek and Mooloolaba. Drivers on the Sunshine Motorway and Nicklin Way should be alert for temporary traffic control measures as crews prepare for the new overpass connecting Nicklin Way to Brisbane Road. Additionally, in the Caloundra area, the Transport Corridor Upgrade continues to affect movement near the intersection of Nicklin Way, Omrah Avenue, and Bowman Road.
Public Transport: Rail and Bus Disruptions
The Sunshine Coast Rail Line is currently experiencing system-wide delays of approximately 15 minutes. These disruptions began earlier this week on March 9 and are expected to continue through the morning peak. Commuters heading toward Brisbane should check the latest station displays for real-time adjustments. Additionally, the commuter car park south of Bruce Parade at Glass House Mountains remains closed due to construction of the new Burgess Street rail overpass.
Bus commuters are also facing localized detours. In Bokarina, two bus stops on Dune Vista Drive near Beachcomber Court are closed, affecting routes 5631 and 5704. These services are currently detouring via Magnolia, Camelia, and Dahlia Streets. In Dicky Beach, Cooroy Street remains closed between Coochin Street and Beerburrum Street, with routes 5541 and 5551 redirected to alternative stops on Beerburrum Street.
Travel Recommendations
To ensure a smoother commute today, sunshinecoast.news recommends the following:
- Allow Extra Time: Add at least 20 minutes to journeys involving the Bruce Highway or Steve Irwin Way.
- Check Translink: Verify your bus or train schedule via the official Translink app before leaving home.
- Expect Heavy Vehicles: Be mindful of increased truck movements near the Mooloolah River Interchange and the Beerburrum rail corridor.

Post-Race Recovery and the Wave of the Future: Your Monday Briefing

Major Rail Closure and Local Road Rehabilitation: Commuter Update for Monday, March 16

Public Notice: Infrastructure Works and Community Health Advisories
